Methodology
Five mission phases, one single tool
An approach aligned with design engineering missions, from sketch to as-built works.
Programme & concept design
Collect the client’s requirements, define the scope of work packages and set the sizing assumptions.
Sizing — detailed design
Enter the equipment, apply efficiencies, power factors and coefficients. Summer/winter balances compute continuously.
Checks & compliance
Verify currents and powers, adjust the assumptions and freeze the revision indices.
Tender documents
Generate the tables and calculation notes ready to integrate into the contractor consultation file.
Construction & as-built
Update the balances during the works and deliver the as-built documents in XLSX or PDF.
The calculations of the trade, built in
No black box: every value in the balance is consistent with professional practice.
Summer & winter regimes
Active and apparent powers computed for both regimes, with currents summable per group.
Single & three-phase
Each equipment item handles its own voltage type; the totals adapt automatically.
Efficiencies & coefficients
Efficiency, power factor, utilisation coefficient: the balance formulas apply live on entry.
Indices & revisions
Index history, greyed-out versions and audit log: every change is traced.
Deliver in XLSX or PDF
Full or per-balance exports, with cover page, table of contents and phases included: the document is ready to join your technical file or your as-built package.